• Twitter
  • Facebook
  • Instagram
  • Linkedin
  • YouTube
  • RSS
  • Sign In
  • My Account
High-Profile MonthlyThe Source for AEC Industry News
  • All News
      • Up Front
      • Groundbreaking
      • Topping Off
      • Ribbon Cutting
      • View All Up Front Stories
      • StMarysBank_NorthBranch_ToppingOffNorth Branch Construction Celebrates Topping Off for new St. Mary’s Bank Branch
      • Special Features
      • Contributor
      • Green
      • J.E.D.I.
      • Mechanical / Electrical / Plumbing (MEP)
      • Vision
      • Women In Construction
      • Regions
      • Connecticut
      • Northern New England
      • Popular Sectors
      • Cannabis
      • Corporate
      • Education
      • Healthcare
      • Interiors
      • Landscape/Civil
      • Life Science
      • Multi Residential
      • Restoration/Renovation
      • Retail/Hospitality
      • Senior/Assisted Living
      • Technology & Innovation
      • Other News
      • Awards
      • Community
      • COVID-19
      • Mixed-use
      • Municipal
      • National/International
      • Organizations and Events
      • People
      • Philanthropy
      • Products and Services
      • Real Estate
      • Training and Recruitment
  • Subscribe
  • Next Issue
  • Archive
  • Advertise
  • Podcast
  • A/E/C Associations
  • Calendar
High-Profile Monthly
  • All News
      • Up Front
      • Groundbreaking
      • Topping Off
      • Ribbon Cutting
      • View All Up Front Stories
      • StMarysBank_NorthBranch_ToppingOffNorth Branch Construction Celebrates Topping Off for new St. Mary’s Bank Branch
      • Special Features
      • Contributor
      • Green
      • J.E.D.I.
      • Mechanical / Electrical / Plumbing (MEP)
      • Vision
      • Women In Construction
      • Regions
      • Connecticut
      • Northern New England
      • Popular Sectors
      • Cannabis
      • Corporate
      • Education
      • Healthcare
      • Interiors
      • Landscape/Civil
      • Life Science
      • Multi Residential
      • Restoration/Renovation
      • Retail/Hospitality
      • Senior/Assisted Living
      • Technology & Innovation
      • Other News
      • Awards
      • Community
      • COVID-19
      • Mixed-use
      • Municipal
      • National/International
      • Organizations and Events
      • People
      • Philanthropy
      • Products and Services
      • Real Estate
      • Training and Recruitment
  • Subscribe
  • Next Issue
  • Archive
  • Advertise
  • Podcast
  • A/E/C Associations
  • Calendar
Contributor • Education • MEP

Modernizing While Keeping Historical Appeal

August 26, 2021

by Abdullah Khaliqi

Worcester Polytechnic Institute’s Kaven Hall has helped to contribute to the Civil and Environmental Engineering Department since it was built in 1954 on the corner of Salisbury and Boynton Streets. The building interior has been renovated continually to fit the department’s needs. Still, the exterior has the same look as when it was first built because of how well the brick walls, limestone foundation, and slate roof components age.

Upgrades to a nearly 70-year-old building could be very extensive, but based on a Massachusetts Architectural Access Board (MAAB) analysis, upgrades to building access took center stage. Accessibility upgrades include new building entrances and altering building walls to allow for an elevator to be installed.

Fitzemeyer & Tocci Associates, Inc. is providing MEP/FP engineering for the building, which used window-mounted air conditioners where possible and met ventilation requirements with operable windows. Heating Ventilation and Air Conditioning (HVAC) upgrades included the installation of two new Air Handler Units (AHU) in the attic space. The new AHUs bring modern ventilation rates that meet the American Society of Heating, Refrigeration, and Air-Conditioning Engineers standards and offer the entire building air conditioning.

To allow for air conditioning in Kaven Hall, we identified a potential chilled water source in a nearby building. After running capacity calculations, metering was done for a period to ensure capacity existed in the nearby chilled water system. Routing piping through the older existing building was a challenge, but a path was identified for piping to run across buildings.

Building penetrations needed to not ruin the building aesthetic, as Kaven Hall is located on a prominent street corner. The building was a welcoming jewel to university visitors, especially with the landscape upgrades. Louvers for air intake required by the AHUs were in the back of the building to conceal them as much as possible. The slate roof had to be kept intact, so exhaust ductwork exited the building using the existing chimney.

Lighting upgrades were done throughout the interior and exterior spaces, but a conscious effort was made to minimize electrical wiring and low voltage work inside the building. As is typical in existing building renovations, years of renovation complicate paths available, and there was a fear of potentially opening a can of worms with the building wiring. Existing conduit and ethernet cable were mapped, and the elevator shaft was placed in a location that missed wiring for existing systems.

Replacement windows, tile used in corridors, and new mortar used at exterior bricks match the existing structure exactly. The multi-year construction should wrap up in time for the building to show its full historical potential to students and visitors during the fall semester.

Abdullah Khaliqi

Abdullah Khaliqi, PE, CPQ is academic market leader at Fitzemeyer & Tocci Associates, Inc.

HPNews mep Sept'21
    FacebookXLinkedInEmail

You may also like

Education

Rowse Architects Completes Boyle...

January 21, 2025
Contributor

Ask the Electrician: What are the...

January 8, 2025
Contributor

What’s Next for Construction in...

December 30, 2024
Contributor

Strengthening the AEC Community: A...

December 27, 2024
Contributor

Boston’s Commercial Real...

December 26, 2024
Contributor

Choosing a B2B PR Agency: Why it...

December 19, 2024
Contributor

A/Z’s 2025 Strategic Growth...

December 18, 2024
Education

Erland Construction Completes Two...

December 17, 2024
  • Gray.png
  • Pedigree.png
  • PWC.png
  • INterstate.png

HIGH-PROFILE MONTHLY
615 School St.
Pembroke, MA  02359
Phone: 781 294 4530
Fax:  781 293 5821
info@high-profile.com

Quick Links

  • About Us
  • Contact Us
  • Subscribe
  • Advertise
  • My Account

Stay Informed

Sign up for Fast Facts Friday, our weekly e-newsletter, and stay up-to-date with the latest industry news!

Sign up
Subscribe to High-Profile Monthly to receive an email notice of each new article!
Loading

Copyright © 2026 High-Profile Monthly.

  • Twitter
  • Facebook
  • Instagram
  • Linkedin
  • YouTube
  • RSS
  • Sign In
  • My Account