• Twitter
  • Facebook
  • Instagram
  • Linkedin
  • YouTube
  • RSS
  • Sign In
  • My Account
High-Profile MonthlyThe Source for AEC Industry News
  • All News
      • Up Front
      • Groundbreaking
      • Topping Off
      • Ribbon Cutting
      • View All Up Front Stories
      • StMarysBank_NorthBranch_ToppingOffNorth Branch Construction Celebrates Topping Off for new St. Mary’s Bank Branch
      • Special Features
      • Contributor
      • Green
      • J.E.D.I.
      • Mechanical / Electrical / Plumbing (MEP)
      • Vision
      • Women In Construction
      • Regions
      • Connecticut
      • Northern New England
      • Popular Sectors
      • Cannabis
      • Corporate
      • Education
      • Healthcare
      • Interiors
      • Landscape/Civil
      • Life Science
      • Multi Residential
      • Restoration/Renovation
      • Retail/Hospitality
      • Senior/Assisted Living
      • Technology & Innovation
      • Other News
      • Awards
      • Community
      • COVID-19
      • Mixed-use
      • Municipal
      • National/International
      • Organizations and Events
      • People
      • Philanthropy
      • Products and Services
      • Real Estate
      • Training and Recruitment
  • Subscribe
  • Next Issue
  • Archive
  • Advertise
  • Podcast
  • A/E/C Associations
  • Calendar
High-Profile Monthly
  • All News
      • Up Front
      • Groundbreaking
      • Topping Off
      • Ribbon Cutting
      • View All Up Front Stories
      • StMarysBank_NorthBranch_ToppingOffNorth Branch Construction Celebrates Topping Off for new St. Mary’s Bank Branch
      • Special Features
      • Contributor
      • Green
      • J.E.D.I.
      • Mechanical / Electrical / Plumbing (MEP)
      • Vision
      • Women In Construction
      • Regions
      • Connecticut
      • Northern New England
      • Popular Sectors
      • Cannabis
      • Corporate
      • Education
      • Healthcare
      • Interiors
      • Landscape/Civil
      • Life Science
      • Multi Residential
      • Restoration/Renovation
      • Retail/Hospitality
      • Senior/Assisted Living
      • Technology & Innovation
      • Other News
      • Awards
      • Community
      • COVID-19
      • Mixed-use
      • Municipal
      • National/International
      • Organizations and Events
      • People
      • Philanthropy
      • Products and Services
      • Real Estate
      • Training and Recruitment
  • Subscribe
  • Next Issue
  • Archive
  • Advertise
  • Podcast
  • A/E/C Associations
  • Calendar
Contributor

Design Build: In-House Architecture

February 24, 2021

by Jen Luoni

A common misperception within the design build methodology is that architecture and design do not coexist under the same roof or that design is of lesser quality due to the idea that the general contractor is viewed as the dominant entity. Many clients do not realize that true design build is composed of in-house architects, and only see architects under the umbrella of the general contractor, thereby forsaking creativity for obedience to construction principles. The reality is that architecture plays an equal if not greater role.

The Advantages

Architect as Team Member, not Outlier

Within the true design build method, all team members are recognized as equals to the project’s success. Expertise across roles – architect, project manager or superintendent – harmonizes to produce the best product possible. The ability to have open and honest communication ensures expectations are met.

Realistic Design and Budget Goals

In-house pricing enables architects the ability to align design expectations with budgets. In traditional construction models, a lack of cost understandings leads to over design by many architects. However design build’s value engineering component enables manipulation of the design to attain optimal product for the cost.

Hands-on Experience

Integration within the entire build process engenders enhanced knowledge of construction details, overall product performance, means and methods. Learning through experience and close interaction with subcontractors allows greater understanding of product functioning in the short and long term.

Accelerated Engineering Process

Performance based design allows for engineering to be strategic instead of wrapped within a single line process. Without the need of drawings to get the client to the end goal, engineering can be done in segments to allow phases of construction to proceed even if drawings are not complete. Architects are not stifled by details backed by broad based experience which pushes facility drawings forward. Additionally, experience gained from working with field staff in a non-confrontational environment is key.

Today’s Relevance

Within a market of economic fluctuation, design creativity and timelines can still prosper when utilizing design build. Costs will always play a predominant position within the overall outcome of facility design, yet synergistic decisions between architect and builder streamline processes and create design efficiency while qualifying costs. The design build environment creates a mindset for growth, understanding and experience that enables the best client outcomes.

Jen Luoni

Jen Luoni is director of operations – architecture at Dacon Corporation of Natick, Mass.

designbuild HPNews March'21
    FacebookXLinkedInEmail

You may also like

Trends and Hot Topics

Report Highlights Design-Build’s...

January 9, 2025
Contributor

Ask the Electrician: What are the...

January 8, 2025
Contributor

What’s Next for Construction in...

December 30, 2024
Contributor

Strengthening the AEC Community: A...

December 27, 2024
Contributor

Boston’s Commercial Real...

December 26, 2024
Contributor

Choosing a B2B PR Agency: Why it...

December 19, 2024
Contributor

A/Z’s 2025 Strategic Growth...

December 18, 2024
Contributor • Green

BERDO: From Boston to your Backyard

December 2, 2024
  • Gray.png
  • Pedigree.png
  • PWC.png
  • INterstate.png

HIGH-PROFILE MONTHLY
615 School St.
Pembroke, MA  02359
Phone: 781 294 4530
Fax:  781 293 5821
info@high-profile.com

Quick Links

  • About Us
  • Contact Us
  • Subscribe
  • Advertise
  • My Account

Stay Informed

Sign up for Fast Facts Friday, our weekly e-newsletter, and stay up-to-date with the latest industry news!

Sign up
Subscribe to High-Profile Monthly to receive an email notice of each new article!
Loading

Copyright © 2026 High-Profile Monthly.

  • Twitter
  • Facebook
  • Instagram
  • Linkedin
  • YouTube
  • RSS
  • Sign In
  • My Account