Barrington, RI –Bayside YMCA of Barrington recently celebrated the grand of the new Aquatic Center addition to the facility.
Demolition of an existing pool and locker room facility was performed to make way for the new 12,000 s.f. addition designed by Vision 3 Architects. The addition includes a new six lane lap pool and family play area, as well as locker rooms and lounge space for members. The project also includes interior renovations to the existing building, such as an expanded lobby with cafe area, new child care center, and upgrades to the existing waiting area. Now fully open, the facility remained operational throughout the construction process. New England Construction served as general contractor.

