Portsmouth, NH – Pro Con Inc of Manchester is building the fit-up of a medical office suite in the West Building at 155 Borthwick Avenue to accommodate a fixed Magnetic Resonance Imaging (MRI) unit for Portsmouth Regional Hospital. JSA of Portsmouth is architect for the project.
Pro Con Inc will reinforce the floor of the MRI room by pouring a new slab with steel columns and footings. The interior of the room will be encased with a copper shield and a quench vent will be installed up through the core of the building. Plans call for the MRI to be craned into place through an exterior wall, requiring the exterior skin of the building to be removed prior to installation and then be rebuilt.
The six month project is expected to be completed in late fall.
This is one of several medical office fit-ups Pro Con has managed at 155 Borthwick Ave. including a 7,000sf office fit-up for Beacon Internal Medicine and a 16,000sf fit-up for Portsmouth Regional Hospital’s Physical Therapy and Pediatric Rehabilitation Center.
Pro Con GC for MRI Suite Fit-Up – JSA Architect
Portsmouth, NH – Pro Con Inc of Manchester is building the fit-up of a medical office suite in the West Building at 155 Borthwick Avenue to accommodate a fixed Magnetic Resonance Imaging (MRI) unit for Portsmouth Regional Hospital. JSA of Portsmouth is architect for the project.

