Brookline, Ma – Nauset Construction announced the completion of a new addition and renovation of the Heath School, a K-8 facility located in the Chestnut Hill neighborhood of Brookline. The $6.5 million project was completed on time and within budget even with the additional challenge of having the school fully operational during most of the construction. “Finishing a project with minimal change orders on an occupied school campus really speaks volumes about the teamwork and cooperation of everyone involved,” said Nauset Project Executive Rob Nunez. “We had a great relationship with the owner’s rep and the architect, and the teachers were very supportive of the project, but keeping the kids safe was always the number one priority.”
Both the LEED-standard addition and the renovations were designed by Boston-based architects Miller Dyer Spears Inc., a firm that has designed projects for many of the area’s most prestigious academic institutions, including Harvard, Brandeis, and Emerson College. The addition is a combination of one and-two story wings that house five new classrooms, a science lab, and a multi-purpose room which is outfitted with athletic flooring. The renovations involved the replacement and expansion of the existing kitchen and cafeteria dining space. The library was also expanded to facilitate the growing student population and added services, while the auditorium was upgraded to conform to the American Disabilities Act. The building is comprised of conventional concrete footings and walls with steel-framed construction. The building’s exterior facade features an aluminum storefront and brick-and-mortar masonry walls. Interior finishes include vinyl composite tile, stone tile, resinous flooring and carpeting.
Nauset parlayed its wealth of experience building high quality facilities in occupied environments – from schools to office and medical facilities including nursing homes – into another successful project while maintaining a safe environment for students, teachers, administrators and visitors during all construction phases.

