Bowdoin Construction Completes Campus Ctr. Designed by Dario

Weston, MA – Bowdoin Construction recently completed construction of a new Campus Center for The Rivers School in Weston.

Weston, MA – Bowdoin Construction recently completed construction of a new Campus Center for The Rivers School in Weston.
The project, designed by Dario Designs, Inc., required the demolition of an existing building, and the construction of a new two-story, 30,420sf facility on this active independent school campus.
The building was constructed of structural steel, brick, cultured stone, aluminum/glass curtain wall systems, and a combination of asphalt shingle and EPDM roofing.
Interior spaces feature a large student dining hall with servery, a commercial kitchen, and a café with a fireplace on the upper floor.
The lower level includes 12 classrooms, a large art gallery, math and language department offices, five faculty offices, and several student gathering areas. The finished product displays maple millwork, sloped linear wood ceilings, and varied flooring systems, including carpet tile, terrazzo tile, quarry tile, and VCT, as well as extensive landscaping around the building. The project was completed within 12 months.