Weston, MA – Bowdoin Construction was recently selected by The Rivers School for the construction of its new campus center in Weston. The project, designed by Dario Designs, Inc., requires the demolition of an existing building, and the construction of a new two-story, 30,420sf state-of-the-art facility on the active independent school campus.
The building is being constructed of structural steel, brick, cultured stone, aluminum/glass curtain wall systems, and a combination of asphalt shingle and EPDM roofing.
Interior spaces will feature a large student dining hall with servery, a commercial kitchen and The Rivers Café on the upper floor. The lower level will include 12 classrooms, a large art gallery, math and language department offices, five faculty offices and several student gathering areas.
The finished product will display maple millwork, sloped linear wood ceilings, and varied flooring systems, including carpet tile, terrazzo tile, quarry tile, and VCT, as well as extensive landscaping around the building. Construction is underway and will be completed within a 12 month schedule.
Bowdoin Construction is one of the New England region’s leading construction management and general contracting firms focused on providing a solutions based approach to each of our client’s specific building needs.

